- Siemens supports major energy-efficiency project at Coca-Cola
- 13% reduction in energy consumption and greenhouse gas emissions
- Better air quality and decreased noise as additional benefits
The Coca-Cola European Partners (CCEP) production facility in Jordbro south of Stockholm has reached a new milestone. In less than a year, the 70,000 m² plant has slashed its energy use by 13 percent, thanks to a major energy efficiency project executed with Siemens Smart Infrastructure.
This
publication is not an offer for sale nor a solicitation to buy or subscribe to
any securities in the United States. The information contained herein is not
for distribution, directly or indirectly, in or into the United States of
America and must not be distributed to U.S. persons (as defined in Regulation S
of the U.S. Securities Act of 1933, as amended (the "Securities
Act")) or publications with a general circulation in the United States of
America. Any securities referred to herein have not been and will not be
registered under the Securities Act. There will be no public offering of any
such securities in the United States of America.
- Maturities of two, three, five, seven,
ten and twenty years
- Most favorable interest rates to
date for Siemens U.S. dollar bonds
- Strong demand – bond oversubscribed 2.5
times when price was determined
The number of passengers traveling over long distances has been climbing for years, and operators of high-speed trains face tight competition with airlines and new providers of long-distance, road-based services. Future-proof trains with reduced lifecycle costs and enhanced travel comfort are therefore more important than ever for securing and increasing high-speed rail transport.
- The Carlyle Group is Flender
GmbH’s new owner
- Completion of another step
in executing Vision 2020+ strategy for enabling Siemens to become a focused
technology company
Siemens has successfully
closed the sale of Flender GmbH to The Carlyle Group for €2.025 billion
(enterprise value). In October 2020, Siemens announced its plans to sell the specialized
supplier of mechanical and electrical drive systems to Carlyle. Now that the relevant
authorities have granted the required approvals, the transaction has closed. As
previously announced, the sale of Flender results in a disposal gain of a euro
amount in the mid-triple-digit millions for Siemens AG.
- Order from DB Netz AG for the digital retrofitting of Finnentrop interlocking
- Intelligent control and safety system for 60 kilometers of rail line
- Important step for the digitalization of Germany’s rail network
Siemens Mobility will fully digitalize the Finnentrop interlocking in the state of North-Rhine Westphalia within one year for DB Netz AG. A total of 404 interlocking units will be replaced, including signals, switch points and derailers. In addition, 15 level crossings will be equipped with digital interfaces and four of them will also receive new safety systems.
- Global campus in Zug to reduce carbon footprint
- Target in line with company-wide sustainability program
Siemens Smart Infrastructure plans to transform its global headquarters in Zug, Switzerland, into a carbon neutral location by 2023. To achieve this, a comprehensive renovation of an existing building on Theilerstrasse 1c will commence in May 2021 for a period of two years. Siemens has earmarked around EUR 63 million (CHF 70 million) for the refurbishment works.
- Stylish design combining black glass and brushed aluminum
- Flexible user interface with a wide range of icons for intuitive operation
- Easy control of lighting, shading and room temperature
Siemens Smart Infrastructure introduces the new KNX Touch Control TC5 room operator unit. It makes passive buildings adaptive, consequently boosting the evolution of smart building technologies. With its individually configurable controls, the easy-to-use device simplifies the operation and display of all relevant functions. Thanks to the capacitive 5.0-inch color touch display featuring a contemporary, attractive design, the new device is ideally suited for use in commercial buildings such as conference rooms, offices and hotels. With its flexible mounting concept, Touch Control TC5 can be used worldwide.
- Ninety-four new trains will replace the 1970s-built Piccadilly line fleet
- New trains will be state-of-the-art, with more space, air conditioning, walk-through carriages and improved accessibility
- Vital investment will support both London and the wider UK economy – helping to create jobs around the country
Transport for London (TfL) and Siemens Mobility have today unveiled the detailed design of the new generation Tube trains for the Piccadilly line, which will soon be in production to replace the existing 1970s fleet.
Siemens Mobility is investing twelve million euros in the further modernization of its long-established production site in Vienna-Simmering: Together with Vienna's City Economic Councillor Peter Hanke, the groundbreaking ceremony for the construction project took place on Monday, March 1. The investment will focus on the construction of a new train commissioning hall, the expansion of digitalized production, and the optimization of production workflows. This will further increase the competitiveness of the site and secure local jobs and local value creation. Passenger coaches and metro trains are built at the historic Siemens Mobility plant, for example the new night trains for ÖBB or metro trains for Vienna, Munich, Riyadh or Bangkok. ÖBB's popular Railjets were also manufactured here. At the Vienna plant, Siemens Mobility employs about 1,200 people, manufactures about 450 rail vehicles per year and currently trains a total of 88 apprentices.
In a live broadcast between Berlin and London on Thursday, March 4, 2021, Transport for London and Siemens Mobility unveiled the design of the new London Piccadilly line tube trains. 94 state-of-the-art tube trains will replace the current fleet of the Piccadilly line, which was built in the 1970s. The new generation of trains will offer passengers more spacious, air-conditioned walk-through carriages and improved accessibility. The trains are scheduled to be in service on the Piccadilly line from 2025.