- The latest Logo! 8 logic module series can be integrated in KNX installations
- The Logo! communication module CMK2000 connects Logo! 8 to KNX
- For automation solutions from lighting to access control
The Logo! communications module CMK2000 enables the latest Logo! 8 logic module series from Siemens to be integrated into the KNX building system bus. Logo! 8 is designed for smaller automation solutions. It can now be used in combination with the new communication module for building automation tasks, such as surveillance, access control, air-conditioning, lighting, shading and watering through to pump control. The Logo! KNX module CMK2000 communicates via Ethernet with Logo! 8. It transmits sensor data from KNX bus nodes to the logic module, where they are combined with logic functions. Logo! control commands are transmitted to KNX actuators via the communication module. 50 KNX communication objects can be configured, and linked in the Logo! program with counters, setpoints, and parameters to create automation solutions.
On the first day of Hannover Messe, Klaus Helmrich welcomed you to the yearly press conference. As member of the Managing Board of Siemens AG, Klaus Helmrich is responsible for the Divisions Digital Factory as well as Process Industries and Drives. He was speaking on the digitalization of the industry. The press conference took place on Monday, April 13, at 6:30 PM, in Room 1 of the fair's Convention Center.
The Amberg Electronics Factory showcases Siemens' concept for a "digital enterprise." The factory already employs production methods that will be the standard in many manufacturing facilities in a number of years. Products in the plant control their own assembly by directly communicating their specific requirements and their next production steps via a product code to the machines.
A new and exciting exhibition opens its doors on 8th October 2013 in London at the Crystal. Presented by engineering experts Siemens in conjunction with London Transport Museum and media specialists CBS Outdoor UK, 'Going Underground: Our journey to the future' will showcase future developments for metro-style trains and stations. At the heart of the exhibition will be a full-size mock up of a brand new concept metro train – the Siemens Inspiro. A mix of interactive exhibits on display - housed in a temporary 'station' building - will focus on technologies to help travellers find their way more easily, electronic ticketing developments, passenger information systems and station management solutions. "Going Underground" is free to enter and will be open for a three month period. It will be located on the site of The Crystal in Royal Victoria Docks, London.
Together with Munich Mayor Christian Ude, Siemens President and CEO Peter Löscher has laid the foundation stone for the company's new headquarters building, which will be completed on Wittelsbacherplatz in Munich by the end of 2015. The future inner-city complex will provide employees with a 21st-century working environment and be freely accessible to the general public at ground level. Siemens has set the highest standards for sustainability for its new headquarters, and will fulfill the criteria for minimum energy consumptions in buildings.
Siemens has entered into an agreement to acquire Invensys Rail, the rail automation business of Invensys for approximately €2.2 billion (£1.742 billion). At the same time, the company plans to divest its baggage handling, postal and parcel sorting activities. Both planned transactions are part of the recently launched "Siemens 2014" company program, which amongst others, is aimed at strengthening the company's core activities.