- DB Regio trains speed at 190 kilometers per hour between Bavaria and Thuringia
- Higher capacity, better service, new travel options to the north and south
Germany’s fastest regional train between
Bavaria and Thuringia is set to go. The new Franconia-Thuringia Express (FTX)
operated by Deutsche Bahn (DB) is inaugurating service on the Nuremberg-Erfurt
high-speed line on June 9, with the scheduled so-called small timetable change.
The modern Siemens trains, ordered by the Free States of Bavaria and Thuringia,
will run at a top speed of up to 190 kilometers per hour. To date, only
long-distance trains have operated on the northern section of the VDE 8.1, the
designation for this new and upgraded line.
- Gridscale X LV Management software empowers DSOs to take a holistic approach to unlocking grid flexibility at scale – from planning to operations
- Software acts as an intelligent “co-pilot”, providing step-by-step guidance to prevent low voltage grid instability, reducing outages by 30%
- Enables grid operators to operate the grid closer to its limits and digitalize faster and more efficiently
- Gridscale X LV Management is part of the Siemens Xcelerator portfolio
Today, Siemens unveils its latest Gridscale X offering, LV Management, at Eurelectric’s Power Summit. Embedded with crucial capabilities to actively control the low voltage grid, this represents the first step towards unlocking grid flexibility at scale across planning and operations. With additional insights and transparency over what is happening on the low voltage grid, operators can use the software as a “co-pilot,” helping them to deal with the increasing complexity and challenges related to low voltage grids.
-
Equips Norwegian grid operator Norgesnett with medium-voltage switchgear
and compact substations for sustainable, reliable, and affordable transformation
of national grid
- Norgesnett adopts SF6-free switchgear, saving approximately 1,200 tonnes
of CO2 compared to SF6-gas switchgear over product lifetime
- Siemens’ switchgear utilizes climate-neutral insulating medium “Clean
Air” consisting exclusively of components of ambient air, propelling Norgesnett
toward its sustainability goals
Siemens Smart
Infrastructure has signed a six-year framework agreement with Norgesnett to deliver
SF6 gas-free switchgear in the form of the 8DJH 24 – blue GIS switchgear,
alongside compact substations.
- The University of East London (UEL) has reduced its carbon emissions by 10 percent in phase one of its new net zero strategy
- UEL partnered with Siemens to develop and deliver the strategy, designed to improve energy efficiency and renewable integration
- Siemens and UEL to co-create a ‘Living Lab’ to help embed sustainability into course curriculums
The University of East London (UEL) has reduced its carbon emissions by 10 percent from its 2020/21 baseline to 2022/23 in the first phase of its new net zero strategy, putting the organisation on track to achieve its 2030 net-zero target.
- New AI-based apps for more efficient operation of water infrastructures available on the Siemens Xcelerator marketplace
- Easy integration into existing infrastructure without specialist knowledge
- Siemens to showcase its digitalization and automation portfolio for more sustainability in the water sector at IFAT 2024
Siemens, a leading technology company, has expanded its software portfolio for the water industry, enabling its customers to optimize their plant operations using artificial intelligence - without the need for technical expertise. These self-service solutions enable users to address the most pressing issues in water and wastewater operations: reducing water loss, preventing pollution from sewers, and ensuring the reliability of treatment assets. The effect of these applications is also a contribution to greater sustainability overall, as the world's water resources can be better protected. "Digital technologies have not yet been widely adopted in the water sector so far," says Anja Eimer, General Manager Global Water Business at Siemens. "The existing OT and IT device landscape of is complex, skilled workers are in short supply, and the business benefits of many digital applications have often been unclear. With our new software offerings, we are adressing these conditions and enabling water companies to perform AI-based operational analyses."
- Workstation provides with software-defined automation unprecedented control over factory automation and security
- At Automate 2024, Siemens highlights how co-creator Ford Motor Company will be the first customer to deploy and scale this technology in its manufacturing operations
Siemens, a leading
technology company, today announced a breakthrough in the longstanding
challenge of closely managing numerous hardware control points throughout the
factory. The solution is the new Siemens Simatic Automation
Workstation, which allows manufacturers to replace a hardware PLC, a
conventional HMI and an edge device with a single, software-based workstation.
This ushers in Information Technology (IT) workflows to Operational Technology
(OT) environments.
- Depot to be expanded to 87,550 m²
- New capacity for meeting growing demand
- 100% system availability thanks to digitalized depot operation
- Creation of attractive jobs in the region
- Up to 250 employees at the location in 2026
Siemens Mobility is investing approximately €150 million to expand its service depot in
Dortmund-Eving to 87,550 m² to meet the growing demand for rail services.
Plans call for constructing an additional 12,300 m² service hall
with storage facility, offices, and workshops to handle the maintenance of
trains up to 400 meters long. Construction
of the new building is scheduled to begin in 2024 and be completed by 2026. The
Siemens Mobility depot in Dortmund previously had a total area of
70,000 m² and will cover 157,550 m² when the project is
completed.
- Solar farm is part of a £1.5 million research project funded through UK Research Partnership Investment Fund
- Project in partnership with Siemens aimed at enhancing the University’s research capabilities in developing and testing robots and other autonomous systems for the inspection and maintenance of solar arrays
- Enables the University’s new Institute for Safe Autonomy to become net zero by 2025
Siemens has completed work on a 200kWp solar
farm for the University of York located at the University’s new Institute for
Safe Autonomy, as part of £1.5 million research project.
Today,
Brightline announced that Siemens Mobility (Siemens) has been designated the
“preferred bidder” to build train sets for the Brightline West high-speed rail
project that will connect Las Vegas and Southern California. The contract will
include a fleet of ten “American Pioneer 220” (AP 220) train sets to be
manufactured, delivered to Nevada and tested to support Brightline West’s
timeline of initiating service in 2028.