- Siemens will supply its ultra-fast EV chargers and wall or pole mounted devices across the country
- Electromin is expanding its charger network in Saudi Arabia and plans to develop EV services and infrastructure across the Middle East
Siemens agreed to
supply Electromin, the e-Mobility unit of Saudi Arabia’s lubricants and
automotive services company Petromin, with electric vehicle (EV) chargers for
its planned development of a Kingdom- and region-wide charging network.
- Siemens Energy to supply 20 compressor trains for a critical gas project in the Kingdom of Saudi Arabia (KSA)
- The project will enable the operator to manage its surplus gas volumes efficiently to meet seasonal demands
Siemens Energy was selected to provide centrifugal compressor systems for Saudi Aramco’s Hawiyah Unayzah Gas Reservoir Storage (HUGRS) project. The plant includes a gas injection facility with a capacity of 1,500 million standard cubic feet per day (MMSCFD) (42,475,270 cubic meters per day, or m3/d) and a withdrawal facility capable of processing up to 2,000 MMSCFD (56,633,693 m3/d) of gas.
- First cross-country project in the Middle East and Arab World connecting
the Emirati capital Abu Dhabi in the United Arab Emirates to Sohar in the
Sultanate of Oman; length of 303km
- The Oman section of the network marks the first railway system to be
delivered in history of the Sultanate of Oman
Siemens Mobility, together with its consortium partner Hassan Allam Construction, is
honored to announce that it has been awarded the Abu Dhabi – Sohar Design and
Build Railway Systems and Integration contract by Oman – Etihad Rail, a joint
venture co-owned by the two countries to deliver this network. Siemens Mobility and
Hassan Allam Construction will deliver the design, build and integration of the ETCS
Level 2 signaling, telecom and power supply systems over the 303-kilometer-long
Abu Dhabi – Sohar railway link. The signaling solutions are state-of-the art and
desert-proof. This project marks the first-ever cross-country railway network in the
Middle East and Arab world.
Arja Talakar has been appointed CEO of Siemens Oil & Gas, effective April 1, 2019. He will be based in Houston, Texas, the global headquarters for Oil & Gas and its parent operating company, Siemens Gas and Power.
With six lines and a total route length of 176 kilometers, Riyadh is constructing one of the world’s largest metro projects. Riyadh currently has a population of 6.5 million people which is set to increase to 8.3 million by 2030 due to its rapid urban growth. As part of a consortium with the US company Bechtel and the local construction firms Almabani and Consolidated Contractors Company, Siemens Mobility is responsible for building lines 1 (Blue Line) and 2 (Red Line). Siemens Mobility, as Engineering and Maintenance partner, is supplying the rolling stock for driverless operation. Moreover, the scope includes project management, signaling, power supply, communication systems, depot and workshop equip¬ment, platform screen doors, testing and commissioning and system integration in a turnkey approach.